Stakeholder file

Coordinate Decisions, Access and Safety Information

Organize records, authority, occupants, access, work-area separation, schedule changes and document control in occupied properties.

Decision file

Build a clearer project record

01

Centralize records

Create a controlled repository for surveys, updates, plans, notices, work records and closeout evidence with dates and affected areas.

02

Map ownership and authority

Record unit, limited common property and common property context plus who can approve access, scope changes and communications.

03

Name each project role

Document assessor, laboratory, abatement employer, monitoring role, property contact and decision-maker without merging responsibilities.

04

Plan occupant information

Define what occupants need to know, when, in what languages or accessible formats, and who answers safety questions.

05

Control access and changes

Record occupied routes, work-area boundaries, shutdowns, pets, vulnerable occupants, schedule dependencies and escalation contacts.

06

Close the communication loop

Distribute approved closeout information and update the building record; do not turn a limited result into a building-wide safety claim.

07

Build the stakeholder authority map

Record owner, strata council or manager, tenants, consultants, contractor contacts and affected trades, with each party’s decision authority and communication duty. Keep personal information limited while ensuring safety-critical revisions reach everyone whose work or access changes.

  • Use one controlled contact list
  • Name after-hours escalation
  • Record acknowledgement of revisions
08

Sequence access by building zone

Create a floor or unit plan showing investigation, setup, work, clearance and release stages for each area. Coordinate elevators, corridors, service rooms, ventilation and emergency egress without implying that separation alone establishes a safe condition.

  • Mark shared building systems
  • Protect resident routes
  • Log each zone release
09

Control the document set

Maintain a register for assessment reports, drawings, notices, work procedures, licences, monitoring records and closeout documents. Give revisions an effective date and withdraw superseded copies so an occupied-building team does not act from an old scope.

  • Restrict sensitive distribution
  • Archive superseded revisions
  • Link decisions to source documents
10

Operate one occupied-building coordination log

Record affected units and common areas, authorized contacts, notices, access windows, shared ventilation or service interfaces, emergency routes, work phases and document releases. Limit personal information while ensuring each person receives the safety-critical revision relevant to their access or work. Track acknowledgement and provide a route for schedule changes or unexpected conditions. Keep investigation, setup, work, clearance and release status distinct by area. The log coordinates decisions; it does not itself establish that a barrier, schedule or communication measure makes an area safe.

  • Use a controlled contact list
  • Map shared building systems
  • Protect emergency access
  • Log phased area releases
  • Archive superseded notices

Primary references

Verify current rules at the source

Links checked in the approved research packet on August 26, 2026. Applicability still depends on the property and proposed scope.